Elite Home Remodeling

Primary Bathroom Remodel in Phoenix

Start with the layout

Moving a toilet, a shower or a sink means moving drains, and in most Phoenix homes those drains run under the concrete slab. That isn't a reason not to do it; it's the reason to decide early. A layout that keeps the plumbing where it is costs less and moves faster. A layout that fixes a room that has never worked is often worth the extra slab work.

Common changes in primary baths:

  • Tub out, bigger shower in. See tub-to-shower conversion.
  • Tub moved, not removed. A freestanding tub in a new spot, with a separate shower.
  • One sink to two. See double vanity upgrades.
  • A separate toilet room. Needs a wall, a door, and its own fan.

The parts you won't see

Waterproofing under the shower tile, the slope to the drain, the fan sized and vented outside, and blocking in the walls for grab bars or heavy mirrors. All of it goes in before the finishes and is written into the quote.

How we run the job

You get a written, itemized quote with allowances for anything you haven't picked yet, and a schedule in writing. We pull permits, coordinate inspections, and one project manager stays on the job from demo to the final walk-through. Changes go through a written change order you approve first. Elite Home Remodeling & Repairs, Arizona ROC #366903.

We've enlarged bathrooms in Phoenix-area homes, taking space from next to them to fit a bigger shower and vanity.

Common questions

How long does a primary bathroom remodel take?

Usually 3–4 weeks on site once demo starts. A full layout change with plumbing moves takes longer. The schedule is in writing before we start.

Can you make the bathroom bigger?

Often, by taking space from a closet or the room next to it. It depends on the walls involved; we look at that on the visit.

Do I need a permit?

If plumbing, electrical or walls change, usually yes. We pull it.

Thinking about remodeling?

Get a free consultation. Response within one business day.